Design and execution works for Infrastructure and superstructure works
Extension of Mahle Hall Timisoara

 

Date of issue: March 2010 - Apr. 2010
Project value: 155,000.00 €

 

Montage of prefabricated elements in surface of 900 sm

Execution of concrete floors

Design and execution works for the extension of the warehouse - Yazaki Component Technology Arad

 

Date of issue: Dec. 2009 - March 2010
Project value: 450,000.00 €

 

Extension of docking facilities and warehouses

Exterior roads

Public works

Design and execution works for the Scredder assembly installation
Date of issue: Feb. 2008 - Nov. 2008
Project value: 3,000,000.00 €
The construction of the hall and the offices, the traffic and surrounding platforms,
the water supply and waste water management system, the fitting of a N.D.
connection and a railroad connection - SC Scholz Recycling SRL
Total surface of intervention: 40,000.00 sm
Earthwork volumes commissioned: 65,000.00 cm

Execution of earth dams as protection barriers - 350 ml

Exterior concrete surface: 29,000.00 sm

Pluvial waste water management system, suitable for recycling, on a total length of 4 Km;
Exterior line of fire plugs and a ring for industrial water; buffer pond for the evaporation

management of waters + fire reserve;
Waste water treatment station; electric energy supply through the building of a medium voltage cell
and the installation of two transformer points (2000+630 KW)

Execution within the water management system of a mud and hydrocarbons division station.

All the automatic systems needed for the pumping of pluvial waters and fire groups.

Execution of special foundations for machinery: scredder - 1800 sm;
metal shears and press - 550 sm (approx. 4000 cm of monolith reinforced concrete,

respectively approx. 300 tons of rebar steel.)

Execution of an access connection with DN 59 A, as well as a connection with the

Timisoara - Jimbolia railroad.

All the over- and underground deviation works of optical fibres + CFR telephone network,

needed to free the land from any encumbrances.

Execution of foundations, the supply and montage of 2 weighbridges of 50 tons
Building a prefabricated hall with a 24 m opening
and a length of 66 m, needed to carry out the administrative activity, including all the resistance

and architectural works, associated to a "turnkey handover" agreement.

Design and execution works for the extension and rehabilitation of the hall - SC Gruppo Damidio SA

 

Date of issue: May 2006 - Oct. 2006
Project value: 600,000.00 €

 

Structure consolidation works of the existing hall and the execution of its stilting

Creating additional levels in order to execute the administrative spaces in surface of 480 sm

All the necessary works associated to a ""turnkey handover" agreement
The architecture and exterior and interior installations.

Execution of an air-raid shelter

Prefabricated hall montage at Faist Oradea - SC Ital Prefabricate SRL

 

Date of issue: Sept. 2005 - Dec. 2005
Project value: 100,000.00 €

 

Execution of the prefabricated hall montage of 3100 sm, in the UTA area - Arad

Pillars, secondary beams, walls - prefabricated reinforced concrete

Floors, roof elements, main beams - pre-compressed reinforced concrete

Stairs, anti-seismic beams - monolith reinforced concrete

Prefabricated hall montage at Verofer Arad - SC Ital Prefabricate SRL

 

Date of issue: Sept. 2005 - Oct. 2005
Project value: 45,000.00 €

 

Execution of the prefabricated hall montage of 2000 sm, in the UTA area - Arad

Pillars, secondary beams, walls - prefabricated reinforced concrete

Floors, roof elements, main beams - pre-compressed reinforced concrete

Stairs, anti-seismic beams - monolith reinforced concrete